Sign In | Join Free | My gimpguru.org
China Guangzhou Jin Lun Electric Equipment  Co.,Ltd logo
Guangzhou Jin Lun Electric Equipment Co.,Ltd
19 Years Professional Heat Pump Manufacturer!
Site Member

8 Years

Home > Air To Water Heat Pump >

88KW Air To Water Heat Pump Heating + Hot Water Lower Heat Dissipate For Hotel , Bathroom

Guangzhou Jin Lun Electric Equipment Co.,Ltd
Contact Now

88KW Air To Water Heat Pump Heating + Hot Water Lower Heat Dissipate For Hotel , Bathroom

Brand Name : Meeting

Model Number : MD300D

Certification : CE ISO CCC UKAS,ROHS

Place of Origin : Guangzhou China

MOQ : 5 PCS

Price : Negotiation

Payment Terms : T/T, L/C WESTERN UNION

Supply Ability : 800/MONTH

Delivery Time : 15 days

Packaging Details : Plywooden case

Materail : Galvanized steel sheet

Contactor : Fuji Brand

Copper Pipe thick : 1 mm

Compressor : ZW Series ,With Crank heating

Working Temperature : -20--45 degree

Insulation : Foam pack Pipe and Stick on the machine innner

Defrosting : Automaticlly

Temperature : 60 degree

Heating capacity : 88KW

Cop : 4.5

Dimension : 2040×1100×2000MM

Packing size : 2080×1150×2130MM

Contact Now

88KW Air To Water Heat Pump Heating + Hot Water Lower Heat Dissipate, Hotel ,bathroom

Technology Specification

Air source heat pump function

Refrigerant:R22/R407c/R410A, client can choose the refrigerant/gas.

1.Adopt the advanced scroll compressor, resistance low temp and high efficiency

2.Electrical configuration adopt high quality product of the world to ensure that the unit stable quality and reliable operation.

3.Equipped with high-performance low temp freezing pump and stainless steel water tank

4.adopt the glycol antifreeze as the cooling agent, freezing water temp can be controlled at -25 degrees Celsius.

5.customer may request calcium chloride as an antifreeze.

Commercial cooling: Air conditioner system

Widely used in building air conditioning system, small and medium-sized office,

workshop, restaurants, villas and other air conditioning environment.

A. Payment service

1. T/T

2. L/C (for container order only)

B. Technical service

1. We calculate the capacity and recommend the best models.

2. We supply you the professional refrigeration technical support and electronic technical support for your installation, debugging and operation.

3. We supply the spare parts and technical support in and after the warranty time.

4. We supply the training course to your workers at our factory if you need.

5. We can offer site training to your workers in your place which is negotiable.

C. After-sales service

1. Technical support for your installation, operation and maintenance.

2. Standard warranty time: One years’warranty for heat pumps

You can also pay for extended warranty or we can renegotiate the longer warranty period.

  1. Spare parts and technical support at most economic prices after the warranty.

Easy installation

88KW Air To Water Heat Pump Heating + Hot Water Lower Heat Dissipate For Hotel , Bathroom

88KW Air To Water Heat Pump Heating + Hot Water Lower Heat Dissipate For Hotel , Bathroom

FAQ

Q1. Can I have a sample order for Heat pump or Water tank?

A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

Q2. What about the lead time?

A: Sample needs 3-10days, mass production time depend on the products' quantity.

Q3.Do you offer guarantee for the products?

A: Yes, 12 months since the heat pump depart from the port of loading (Refer to the Bill of Lading).

Our leading products

Air to water heat pump, inverter heat pump, High water temperature heat pump.

Mono block house heating heat pump, Split heat pump, Super low noise heat pump

Heat pump dryer, Ground source heat pump, water to water heat pump, swimming pool heat pump

Packaging & Shipment

1> Meeting heat pump can sure delivery heat pump within 5~20 working days as we warehouse stock condition.

2> Heat pump with strong plywood pallet , strong plywood box for loading, make sure no problem happen during rude transportation

3> All spare parts of the heat pump water heater will together loading into package , one time finished shipment to buyer.

4> Take video of the heat pump for buyer before package to 100% sure buyer get product same as order, no any different.

5>Meeting heat pump offer 100% test online, 5% test in Lab by 24 hour for one lot order (if not new model)

Packaging Details :Standard export packing -with plywood case packages,OEM is available for Factory price heat pump water heaters

Delivery Time :15 work days after arrival of down payment


Product Tags:

air to air source heat pump

      

high temp heat pump

      
Quality 88KW Air To Water Heat Pump Heating + Hot Water Lower Heat Dissipate For Hotel , Bathroom wholesale

88KW Air To Water Heat Pump Heating + Hot Water Lower Heat Dissipate For Hotel , Bathroom Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangzhou Jin Lun Electric Equipment Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)